O'Meara Solar, a Renewable Energy Vermont Member and Provisional PV Partner

4/29/2014

1 Comment

 
We are now a REV member and provisional partner. You can see our listing at http://www.revermont.org/main/omeara-solar/
Picture
1 Comment

Vermont Net-metering Summary

4/24/2014

0 Comments

 
We have had several questions regarding net-metering in our area. In particular, what is the impact on the Washington Electric Co-op (WEC) current position of taking on no new net-metered installs.  With respect to WEC, here is a excerpt from Renewable Energy Vermont's Summary on the new legislation.
Raises cap from 4% to 15% of utility’s peak load.
  • WEC has 90 days to submit a new rate proposal to the PSB.  The final timeline will depend on the length of time it takes for the PSB process to complete (e.g. if there are interveners = longer time). Upon approval, applications can resume being accepted by WEC.
O'Meara Solar will still be giving system estimates to potential WEC members, in preparation for installations this year, that will commence after the 90-day window.

You can see the REV summary of the new legislation at http://www.greenenergytimes.net/2014/04/04/net-metering-summary-house-bill-702/
0 Comments

    Author

    Solar Installers for Vermont and New Hampshire.

    Archives

    March 2017
    May 2015
    February 2015
    December 2014
    September 2014
    July 2014
    June 2014
    May 2014
    April 2014

    Categories

    All

    RSS Feed

802-522-2381
PO BOX 151, WEST TOPSHAM, VT 05086